Service group 03 / 06· Kitchens · bathrooms · whole-home renovations
Remodels,fromtheplumbingout.
Most remodels live or die by what’s behind the walls. We start with the plumbing, gas, venting and mechanical, then carry the project through to the finishes — one company, one schedule, one point of contact.
Layout changes, new sinks and islands, gas ranges and hoods, dishwashers, disposals and pot fillers — with the supply, drain, vent and gas lines moved or added to suit the new kitchen.
Tub-to-shower conversions, walk-in and curbless showers, new vanities and toilets, and full gut remodels — waterproofed and plumbed right, so the new bathroom doesn’t hide a future leak.
Homeowner with a leak, builder with a set of plans, property manager with a rooftop unit down — you reach someone who can actually answer the question.
A few quick fields. No account. A real person calls you back.
Questions, answered
Before you call
Do you handle the whole remodel or just the plumbing?
Both. We can take a kitchen, bath or renovation from layout through finishes, or come in for the plumbing, gas and mechanical scope on a remodel someone else is running. Trades we don’t do in-house are handled by licensed subcontractors we hire and manage.
How long does a bathroom remodel take?
A straightforward tub-to-shower conversion can take about a week; a full gut remodel usually runs several weeks, depending on layout changes, materials and inspections. We’ll give you a realistic schedule with the estimate.